← Top Contractors
WERR CORPORATION INTERNATIONAL
- Projects
- 5
5 completed, 0 ongoing, 0 upcoming
- Total budget
- ₱190,556,000
- Citizen rating
-
Not yet rated
- Finished on time
-
5 of 5 (100%)
Only projects with both a target and an actual completion date can be counted.
- Public reports
- 0
How to read these numbers
- Where the data comes from
- Projects, budgets and dates come from the public records of the Department of Public Works and Highways (DPWH), as published. They may be incomplete or out of date.
- What a rating means
- A rating is the opinion of the residents who left it. It is not an audit.
- What a report means
- A report is a problem a resident filed and confirmed by email. It is not a finding that the contractor is at fault. “Looked at” means LGU staff have acknowledged or acted on it.
Draft for review: this explanation has not yet been checked by an expert.
Projects
| Project |
Status |
Progress |
Budget |
Agency |
| Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Improvement/Desilting of Marikina River K0003+000 - K0004+ DREDGING/DESILTING |
Completed |
100% |
₱44,653,000 |
Metro Manila 1st District Engineering Office |
| Improvement/Construction of Gravity Wall (with Gabions as Foundation) at Intermittent Section along Bulao River from Sta. 0+400 to Sta. 3+000 Antipol |
Completed |
100% |
₱43,176,000 |
Rizal 1st District Engineering Office |
| Improvement/Construction of Gravity Wall with Gabions as Foundation @ Intermittent Section along Cainta River Sta. 4+678 to Sta. 5+806 Cainta Rizal |
Completed |
100% |
₱41,310,000 |
Rizal 1st District Engineering Office |
| Proposed Excavation/Desilting of San Juan River (Sta 3+025-Sta 3+495) DREDGING/DESILTING |
Completed |
100% |
₱36,480,000 |
Metro Manila 1st District Engineering Office |
| Proposed Excavation/Desilting of Salapan Creek (Sta. 0+000 to Sta. 0+900) DREDGING/DESILTING |
Completed |
100% |
₱24,937,000 |
Metro Manila 1st District Engineering Office |