TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC

Projects
2 1 completed, 1 ongoing, 0 upcoming
Total budget
₱1,138,081,000
Citizen rating
Not yet rated
Finished on time
1 of 1 (100%) Only projects with both a target and an actual completion date can be counted.
Public reports
0

How to read these numbers

Where the data comes from
Projects, budgets and dates come from the public records of the Department of Public Works and Highways (DPWH), as published. They may be incomplete or out of date.
What a rating means
A rating is the opinion of the residents who left it. It is not an audit.
What a report means
A report is a problem a resident filed and confirmed by email. It is not a finding that the contractor is at fault. “Looked at” means LGU staff have acknowledged or acted on it.

If something here is wrong, tell us through the contact form.

Reply as this contractor

Draft for review: this explanation has not yet been checked by an expert.

Projects

Project Status Progress Budget Agency
Design and Build for the Construction of Wawang Polo and Coloong Pumping Stations in Valenzuela City CONSTRUCTION Ongoing 2% ₱1,027,579,000 Metro Manila 3rd District Engineering Office
Phase I - Drainage Improvement at Boni-Maysilo Circle West of Mandaluyong Main Drainage Project Completed 100% ₱110,502,000 Metro Manila 1st District Engineering Office