MSB VITUG CONSTRUCTION

Projects
14 13 completed, 1 ongoing, 0 upcoming
Total budget
₱1,216,190,791
Citizen rating
Not yet rated
Finished on time
8 of 9 (89%) Only projects with both a target and an actual completion date can be counted.
Public reports
0

How to read these numbers

Where the data comes from
Projects, budgets and dates come from the public records of the Department of Public Works and Highways (DPWH), as published. They may be incomplete or out of date.
What a rating means
A rating is the opinion of the residents who left it. It is not an audit.
What a report means
A report is a problem a resident filed and confirmed by email. It is not a finding that the contractor is at fault. “Looked at” means LGU staff have acknowledged or acted on it.

If something here is wrong, tell us through the contact form.

Reply as this contractor

Draft for review: this explanation has not yet been checked by an expert.

Projects

Project Status Progress Budget Agency
CONSTRUCTION of NATIONAL LABOR RELATIONS COMMISSION (NLRC) OFFICE BUILDING, AGHAM ROAD CORNER NORTH AVENUE, QUEZON CITY Ongoing 81% ₱285,152,630 National Capital Region
REVETMENT and DREDGING WORKS along STA. 14+038 to STA. 16+050 (TULLAHAN RIVER-LEFT BANK) TULLAHAN BRIDGE, BRGY. TALIPAPA-GOOD WILL HOMES I SUBDIVISION, BRGY. SAN BARTOLOME, QUEZON CITY Completed 100% ₱279,960,209 Flood Control Management Cluster
CONSTRUCTION of NATIONAL LABOR RELATIONS COMMISSION (NLRC) OFFICE BUILDING, AGHAM ROAD CORNER NORTH AVENUE, QUEZON CITY Completed 100% ₱144,750,000 National Capital Region
Improvement/Desilting of Mangahan Floodway from K0003+072 - K0003+718 Pasig City DREDGING/DESILTING Completed 100% ₱90,926,000 Metro Manila 1st District Engineering Office
REHABILITATION of SAN JUAN RIVER, PHASE V, QUEZON CITY Completed 100% ₱77,323,411 Quezon City 2nd DEO
Proposed Construction of Revetment with Pile Cap along Pasig River at the Malacañang Palace Heroes Hall Completed 100% ₱47,923,000 North Manila District Engineering Office
Proposed Dredging/Deepening of Marikina River Sta. 5+200-Sta. 6+100 Upstream of Rosario Bridge Pasig City Completed 100% ₱47,000,000 Metro Manila 1st District Engineering Office
Improvement/desilting of Mangahan Floodway from K0007+900 to K0008+200 Taytay Rizal DREDGING/DESILTING Completed 100% ₱45,960,000 Rizal 1st District Engineering Office
Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Improvement/Desilting of Pilot Channel of Mangahan Floodway CONSTRUCTION Completed 100% ₱44,222,000 Metro Manila 1st District Engineering Office
Excavation/Desilting of San Juan River Mandaluyong City Sta. 0+350-Sta. 0+700 DREDGING/DESILTING Completed 100% ₱41,327,000 Metro Manila 1st District Engineering Office
Proposed Installation of Pumps and Its Facilities/Appurlinances at Malacañang Compound Completed 100% ₱29,228,000 North Manila District Engineering Office
REHABILITATION of SAN JUAN RIVER (PHASE VI), QUEZON CITY Completed 100% ₱28,931,540 Quezon City 2nd DEO
Drainage Improvement at Sgt. Bumatay Katarungan Bulalakaw Drainage Lateral of Mandaluyong Main Drainage Project Mandaluyong City Completed 100% ₱26,881,000 Metro Manila 1st District Engineering Office
Repair of collapsed revetment wall along Pasig River at Barangay Buayang Bato Mandaluyong City Completed 100% ₱26,606,000 Metro Manila 1st District Engineering Office