- Projects
- 8
8 completed, 0 ongoing, 0 upcoming
- Total budget
- ₱248,919,181
- Citizen rating
-
Not yet rated
- Finished on time
-
3 of 4 (75%)
Only projects with both a target and an actual completion date can be counted.
- Public reports
- 0
How to read these numbers
- Where the data comes from
- Projects, budgets and dates come from the public records of the Department of Public Works and Highways (DPWH), as published. They may be incomplete or out of date.
- What a rating means
- A rating is the opinion of the residents who left it. It is not an audit.
- What a report means
- A report is a problem a resident filed and confirmed by email. It is not a finding that the contractor is at fault. “Looked at” means LGU staff have acknowledged or acted on it.
Draft for review: this explanation has not yet been checked by an expert.
Projects
| Project |
Status |
Progress |
Budget |
Agency |
| Improvement/desilting of Mangahan Floodway from K0002+225 to K0003+072 Pasig City DREDGING/DESILTING |
Completed |
100% |
₱89,971,000 |
Metro Manila 1st District Engineering Office |
| Proposed Pilot Dredging/Deepening of Mangahan Floodway Channel Phase I Sta. 8+300 to Sta. 9+000 |
Completed |
100% |
₱46,134,000 |
Rizal 1st District Engineering Office |
| Flood Control Projects based on Flood Master Plan for Metro Manila and Surrounding Areas - Improvement/Desilting of Pilot Channel of Mangahan Floodway DREDGING/DESILTING |
Completed |
100% |
₱46,122,000 |
Rizal 1st District Engineering Office |
| CONSTRUCTION of SCT. ALZARAZ ST. 000.0000 to 000.7000, QUEZON CITY |
Completed |
100% |
₱19,208,000 |
Quezon City 1st DEO |
| Emergency reconstruction of collapsed Riverwall along Malabon-Navotas River (Mandaragat Kanduli & Mormons Sections) |
Completed |
100% |
₱18,825,000 |
Malabon-Navotas District Engineering Office |
| CONSTRUCTION of FEEDER CHANNELS for the BLUMENTRITT INTERCEPTOR, QUEZON CITY |
Completed |
100% |
₱9,647,181 |
National Capital Region |
| REHABILITATION of ROAD at SCT. ALCARAZ, BRGY. SIENA, QUEZON CITY |
Completed |
100% |
₱9,506,000 |
Quezon City 1st DEO |
| CONSTRUCTION of ROAD INCLUDING DRAINAGE at NICANOR ROXAS STREET, BRGY. SAN ISIDRO LABRADOR, QUEZON CITY |
Completed |
100% |
₱9,506,000 |
Quezon City 1st DEO |