HONEYVILLE CONSTRUCTION

Projects
9 9 completed, 0 ongoing, 0 upcoming
Total budget
₱292,496,000
Citizen rating
Not yet rated
Finished on time
8 of 9 (89%) Only projects with both a target and an actual completion date can be counted.
Public reports
0

How to read these numbers

Where the data comes from
Projects, budgets and dates come from the public records of the Department of Public Works and Highways (DPWH), as published. They may be incomplete or out of date.
What a rating means
A rating is the opinion of the residents who left it. It is not an audit.
What a report means
A report is a problem a resident filed and confirmed by email. It is not a finding that the contractor is at fault. “Looked at” means LGU staff have acknowledged or acted on it.

If something here is wrong, tell us through the contact form.

Reply as this contractor

Draft for review: this explanation has not yet been checked by an expert.

Projects

Project Status Progress Budget Agency
Improvement/Construction of gravity Wall with Gabions as Foundation @ Intermittent Section along Cainta River Sta. 8+901 to Sta. 10+300 Cainta Riza Completed 100% ₱44,996,000 Rizal 1st District Engineering Office
Flood Conrol Projects based on Master Plan for Metro Manila and Surrounding Areas - Improvement of Buli River DREDGING/DESILTING Completed 100% ₱44,969,000 Metro Manila 1st District Engineering Office
Improvement/Construction of Gravity Wall with Gabions as Foundation along Cainta River at Intermittent Section from Sta 0+300-Sta 5+200 (East Side of CONSTRUCTION Completed 100% ₱44,863,000 Rizal 1st District Engineering Office
Improvement/Construction of Gravity Wall along Taytay River at Intermittent Section from Sta. 0+520 to Sta. 6+040 Taytay Rizal Completed 100% ₱44,846,000 Rizal 1st District Engineering Office
Improvement/Construction of Gravity Wall with Gabions as Foundation along Lakeshore Dike from Sta 9+914-Sta 10+756 (West Side of Mangahan Floodway) T CONSTRUCTION Completed 100% ₱32,517,000 Rizal 1st District Engineering Office
Maintenance/desiltation works along Munting Dilao Creek from Sta. 0+000 to Sta. 6+182 Cainta & Antipolo Rizal DREDGING/DESILTING Completed 100% ₱29,260,000 Rizal 1st District Engineering Office
Improvement/construction of Gravity Wall with Gabions as Foundation along Bulao River at Intermittent Section from 2+000 to Sta. 5+500 Antipolo City CONSTRUCTION Completed 100% ₱26,799,000 Rizal 1st District Engineering Office
Improvement/construction of Gravity Wall with Gabions as Foundation from 4+200 to Sta. 5+000 Taytay River Taytay Rizal CONSTRUCTION Completed 100% ₱15,248,000 Rizal 1st District Engineering Office
Improvement/construction of gravity wall (with gabions as foundation) at Intermittent Section along Cainta River (West Side) from Sta. 0+360 to Sta. Completed 100% ₱8,998,000 Rizal 1st District Engineering Office