HONEYVILLE CONSTRUCTION
- Projects
- 9
9 completed, 0 ongoing, 0 upcoming
- Total budget
- ₱292,496,000
- Citizen rating
-
Not yet rated
- Finished on time
-
8 of 9 (89%)
Only projects with both a target and an actual completion date can be counted.
- Public reports
- 0
How to read these numbers
- Where the data comes from
- Projects, budgets and dates come from the public records of the Department of Public Works and Highways (DPWH), as published. They may be incomplete or out of date.
- What a rating means
- A rating is the opinion of the residents who left it. It is not an audit.
- What a report means
- A report is a problem a resident filed and confirmed by email. It is not a finding that the contractor is at fault. “Looked at” means LGU staff have acknowledged or acted on it.
Draft for review: this explanation has not yet been checked by an expert.
Projects
| Project |
Status |
Progress |
Budget |
Agency |
| Improvement/Construction of gravity Wall with Gabions as Foundation @ Intermittent Section along Cainta River Sta. 8+901 to Sta. 10+300 Cainta Riza |
Completed |
100% |
₱44,996,000 |
Rizal 1st District Engineering Office |
| Flood Conrol Projects based on Master Plan for Metro Manila and Surrounding Areas - Improvement of Buli River DREDGING/DESILTING |
Completed |
100% |
₱44,969,000 |
Metro Manila 1st District Engineering Office |
| Improvement/Construction of Gravity Wall with Gabions as Foundation along Cainta River at Intermittent Section from Sta 0+300-Sta 5+200 (East Side of CONSTRUCTION |
Completed |
100% |
₱44,863,000 |
Rizal 1st District Engineering Office |
| Improvement/Construction of Gravity Wall along Taytay River at Intermittent Section from Sta. 0+520 to Sta. 6+040 Taytay Rizal |
Completed |
100% |
₱44,846,000 |
Rizal 1st District Engineering Office |
| Improvement/Construction of Gravity Wall with Gabions as Foundation along Lakeshore Dike from Sta 9+914-Sta 10+756 (West Side of Mangahan Floodway) T CONSTRUCTION |
Completed |
100% |
₱32,517,000 |
Rizal 1st District Engineering Office |
| Maintenance/desiltation works along Munting Dilao Creek from Sta. 0+000 to Sta. 6+182 Cainta & Antipolo Rizal DREDGING/DESILTING |
Completed |
100% |
₱29,260,000 |
Rizal 1st District Engineering Office |
| Improvement/construction of Gravity Wall with Gabions as Foundation along Bulao River at Intermittent Section from 2+000 to Sta. 5+500 Antipolo City CONSTRUCTION |
Completed |
100% |
₱26,799,000 |
Rizal 1st District Engineering Office |
| Improvement/construction of Gravity Wall with Gabions as Foundation from 4+200 to Sta. 5+000 Taytay River Taytay Rizal CONSTRUCTION |
Completed |
100% |
₱15,248,000 |
Rizal 1st District Engineering Office |
| Improvement/construction of gravity wall (with gabions as foundation) at Intermittent Section along Cainta River (West Side) from Sta. 0+360 to Sta. |
Completed |
100% |
₱8,998,000 |
Rizal 1st District Engineering Office |