| CONSTRUCTION of FLOOD CONTROL STRUCTURES at TULLAHAN RIVER, BARANGAY TALIPAPA, QUEZON CITY |
Isinasagawa |
17% |
₱56,732,934 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BARANGAY GULOD, QUEZON CITY |
Natapos |
100% |
₱50,895,470 |
Quezon City 1st DEO |
| REHABILITATION of FLOOD CONTROL STRUCTURE (PHASE 2), BARANGAY STA. MONICA, QUEZON CITY |
Natapos |
100% |
₱48,996,289 |
Quezon City 1st DEO |
| CONSTRUCTION of FLOOD CONTROL STRUCTURE at BARANGAY NOVALICHES PROPER, QUEZON CITY (PHASE II) |
Natapos |
100% |
₱48,458,879 |
Quezon City 1st DEO |
| IMPROVEMENT of ROAD at BARANGAY NOVALICHES PROPER, QUEZON CITY |
Isinasagawa |
0% |
₱48,117,717 |
Quezon City 1st DEO |
| CONSTRUCTION of FLOOD CONTROL STRUCTURE and TRIBUTARIES along CULIAT CREEK, BARANGAY BAHAY TORO, QUEZON CITY |
Natapos |
100% |
₱48,020,584 |
Quezon City 1st DEO |
| CONSTRUCTION of FLOOD MITIGATION STRUCTURE, BARANGAY SAN BARTOLOME, QUEZON CITY (PACKAGE 1B) |
Isinasagawa |
26% |
₱47,766,142 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BARANGAY MILAGROSA, PHASE IV, QUEZON CITY |
Natapos |
100% |
₱41,009,704 |
Quezon City 2nd DEO |
| CONSTRUCTION of 4-STOREY 8-CLASSROOM SCHOOL BUILDING in DR. JOSEFA JARA MARTINEZ HIGH SCHOOL, BARANGAY TATALON, QUEZON CITY |
Isinasagawa |
95% |
₱39,680,323 |
Quezon City 2nd DEO |
| CONSTRUCTION of MULTI PURPOSE BUILDING at BRGY. APOLONIO SAMSON (GOVERNMENT CIVIC CENTER), QUEZON CITY |
Isinasagawa |
0% |
₱39,203,872 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING (PHASE 3), BARANGAY KALIGAYAHAN, QUEZON CITY |
Isinasagawa |
41% |
₱38,807,793 |
Quezon City 1st DEO |
| CONSTRUCTION (COMPLETION) of MULTI-PURPOSE BUILDING at LUKARYA STREET, BRGY. TALIPAPA, QUEZON CITY |
Natapos |
100% |
₱38,415,468 |
Quezon City 1st DEO |
| CONSTRUCTION (COMPLETION) of MULTI - PURPOSE BUILDING, BARANGAY GULOD (PHASE 2), QUEZON CITY |
Isinasagawa |
46% |
₱37,829,903 |
Quezon City 1st DEO |
| CONSTRUCTION of 3 STOREY - 6 CLASSROOM BUILDING, DIOSDADO P. MACAPAGAL ELEMENTARY SCHOOL, QUEZON CITY |
Natapos |
100% |
₱29,909,976 |
Quezon City 2nd DEO |
| REHABILITATION of DRAINAGE, MARIBLO CREEK, QUEZON CITY |
Natapos |
100% |
₱29,596,000 |
Quezon City 1st DEO |
| REHABILITATION of FLOOD CONTROL STRUCTURE at ST. JAMES, BARANGAY NAGKAISANG NAYON, QUEZON CITY |
Natapos |
100% |
₱29,399,739 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING at BARANGAY ST. PETER, QUEZON CITY |
Isinasagawa |
74% |
₱29,373,494 |
Quezon City 1st DEO |
| REHABILITATION of SAN JUAN RIVER (PHASE VII), QUEZON CITY |
Natapos |
100% |
₱28,939,587 |
Quezon City 2nd DEO |
| CONSTRUCTION of DRAINAGE SYSTEMS at VICTORIAN HEIGHTS, BRGY. SAUYO, QUEZON CITY |
Isinasagawa |
20% |
₱28,917,976 |
Quezon City 1st DEO |
| CONSTRUCTION of FLOOD CONTROL STRUCTURE at BARANGAY BAESA, QUEZON CITY |
Natapos |
100% |
₱28,809,000 |
Quezon City 1st DEO |
| REHABILITATION of ROAD, APO STREET, QUEZON CITY |
Natapos |
100% |
₱28,518,000 |
Quezon City 1st DEO |
| DRAINAGE IMPROVEMENT and CONCRETING of ROADS at BRGY. SAUYO, QUEZON CITY |
Isinasagawa |
66% |
₱28,517,434 |
Quezon City 1st DEO |
| CONSTRUCTION (COMPLETION) of MULTI-PURPOSE BUILDING, BARANGAY GREATER LAGRO, QUEZON CITY |
Isinasagawa |
0% |
₱19,601,976 |
Quezon City 1st DEO |
| IMPROVEMENT of ROAD and DRAINAGE in CARREON AGUIRRE in BRGY. SAN BARTOLOME, QUEZON CITY |
Natapos |
100% |
₱19,601,951 |
Quezon City 1st DEO |
| IMPROVEMENT of REHABILITATION of DRAINAGE SYSTEM, BRGY. DAMAYANG LAGI, QUEZON CITY 4TH LD |
Natapos |
100% |
₱19,482,112 |
Quezon City 2nd DEO |
| CONSTRUCTION of ROAD along SAN DIONISIO BRIDGE, BARANGAY NAGKAISANG NAYON, QUEZON CITY |
Isinasagawa |
62% |
₱19,403,797 |
Quezon City 1st DEO |
| REHABILITATION of FLOOD CONTROL STRUCTURE at TULLAHAN RIVER at BARANGAY NAGKAISANG NAYON, QUEZON CITY |
Natapos |
100% |
₱19,387,374 |
Quezon City 1st DEO |
| DRAINAGE IMPROVEMENT and REHABILITATION at CRUZ and SAPLAN, BARANGAY CULIAT, QUEZON CITY |
Isinasagawa |
18% |
₱19,206,946 |
Quezon City 1st DEO |
| CONSTRUCTION (COMPLETION) of MULTI-PURPOSE BUILDING (PHASE 4), BARANGAY SAN AGUSTIN, QUEZON CITY |
Natapos |
100% |
₱19,107,000 |
Quezon City 1st DEO |
| REHABILITATION of DRAINAGE, CALAMBA ST., QUEZON CITY |
Natapos |
100% |
₱19,051,200 |
Quezon City 1st DEO |
| IMPROVEMENT/ REHABILITATION of DRAINAGE SYSTEM, BRGY. SACRED HEART, QUEZON CITY 4TH LD |
Natapos |
100% |
₱19,024,869 |
Quezon City 2nd DEO |
| IMPROVEMENT/ REHABILITATION of DRAINAGE SYSTEM along ROCES AVE., QUEZON CITY |
Natapos |
100% |
₱19,001,198 |
Quezon City 2nd DEO |
| IMPROVEMENT/ REHABILITATION of DRAINAGE SYSTEM, BRGY. DUYAN-DUYAN, QUEZON CITY 3RD LD |
Natapos |
100% |
₱18,837,512 |
Quezon City 2nd DEO |
| CONSTRUCTION of GREENWAY PROJECT, VISTA REAL CLASSICA, BATASAN HILLS, QUEZON CITY |
Natapos |
100% |
₱18,807,789 |
Quezon City 1st DEO |
| PROPOSED CONSTRUCTION of PROPERTY and SUPPLY BUILDING (THREE (3) STOREY) QUEZON CITY GENERAL HOSPITAL, Q.C. |
Natapos |
100% |
₱18,611,284 |
Quezon City 1st DEO |
| IMPROVEMENT/ REHABILITATION of DRAINAGE SYSTEM along KAPILIGAN ST., QUEZON CITY |
Natapos |
100% |
₱18,422,995 |
Quezon City 2nd DEO |
| REHABILITATION of GASAN STREET, QUEZON CITY |
Natapos |
100% |
₱17,075,173 |
Quezon City 1st DEO |
| CONSTRUCTION (COMPLETION) of MULTI-PURPOSE BUILDING, BARANGAY STA. LUCIA, QUEZON CITY (PHASE 3) |
Isinasagawa |
10% |
₱14,552,710 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BARANGAY GULOD, QUEZON CITY (PHASE 3) |
Isinasagawa |
9% |
₱14,550,473 |
Quezon City 1st DEO |
| REHABILITATION of GENERAL AVENUE, QUEZON CITY |
Natapos |
100% |
₱14,265,350 |
Quezon City 1st DEO |
| CONCRETING and DRAINAGE IMPROVEMENT at BRGY. CULIAT, QUEZON CITY |
Natapos |
100% |
₱14,258,800 |
Quezon City 1st DEO |
| CONCRETING and DRAINAGE IMPROVEMENT at BRGY. BAESA, QUEZON CITY |
Natapos |
100% |
₱14,229,556 |
Quezon City 1st DEO |
| CONSTRUCTION of DRAINAGE FEEDER LINES CONNECTING to BLUMENTRITT INTERSECTORS (ALIGNMENT along MA. CLARA STREET), QUEZON CITY |
Natapos |
100% |
₱13,232,807 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI PURPOSE BUILDING at BRGY. TALIPAPA, QUEZON CITY |
Isinasagawa |
0% |
₱12,741,172 |
Quezon City 1st DEO |
| REHABILITATION of MULTI-PURPOSE BUILDING (PHASE 2), BARANGAY SAN AGUSTIN, QUEZON CITY |
Natapos |
100% |
₱11,523,524 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI - PURPOSE BUILDING, BARANGAY GULOD, NOVALICHES, QUEZON CITY |
Natapos |
100% |
₱9,899,975 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, PASONG PUTIK, QUEZON CITY |
Natapos |
100% |
₱9,899,850 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI PURPOSE BUILDING at BARANGAY BALONBATO, QUEZON CITY |
Isinasagawa |
7% |
₱9,800,359 |
Quezon City 1st DEO |
| REHABILITATION of ROAD INCLUDING DRAINAGE, BARANGAY GREATER FAIRVIEW, QUEZON CITY |
Natapos |
100% |
₱9,799,950 |
Quezon City 1st DEO |
| REHABILITATION of ROAD at VETERANS, BRGY. HOLY SPIRIT, QUEZON CITY |
Isinasagawa |
0% |
₱9,701,402 |
Quezon City 1st DEO |
| REHABILITATION of MULTI-PURPOSE BUILDING at BRGY. DAMAR, QUEZON CITY |
Natapos |
100% |
₱9,621,713 |
Quezon City 1st DEO |
| CONSTRUCTION of MPB, BRGY. TANDANG SORA, QUEZON CITY |
Natapos |
100% |
₱9,605,112 |
Quezon City 1st DEO |
| CONCRETING of ROAD with DRAINAGE IMPROVEMENT RIVERA COMPOUND, MARCEL DRIVE EXTENSION, LIANO ST., BRGY. SANGANDAAN, QUEZON CITY |
Natapos |
100% |
₱9,603,216 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING (COVERED PATHWALK) CONSTRUCTION of PARKING GROUND at the VICINITY of QUEZON CITY GENERAL HOSPITAL, BRGY. BAHAY TORO, QUEZON CITY |
Natapos |
100% |
₱9,603,000 |
Quezon City 1st DEO |
| CONSTRUCTION/ REHABILITATION of MULTI-PURPOSE BUILDING, SAN JOSE, QUEZON CITY |
Natapos |
100% |
₱9,603,000 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING (PHASE 3) BARANGAY SAN AGUSTIN, QUEZON CITY |
Natapos |
100% |
₱9,603,000 |
Quezon City 1st DEO |
| CONSTRUCTION/ REHABILITATION of MULTI-PURPOSE BUILDING (HEALTH CENTER), BRGY. BAGONG PAG-ASA, QUEZON CITY |
Natapos |
100% |
₱9,602,863 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BRGY. PASONG PUTIK, QUEZON CITY |
Natapos |
100% |
₱9,602,854 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BRGY. GULOD, QUEZON CITY |
Natapos |
100% |
₱9,602,821 |
Quezon City 1st DEO |
| REHABILITATION of ROAD INCLUDING DRAINAGE at BARANGAY NOTH FAIRVIEW, QUEZON CITY |
Natapos |
100% |
₱9,510,851 |
Quezon City 1st DEO |
| CONSTRUCTION of ROAD MALIBU STREET, BRGY. FAIRVIEW (000.000 to 000.3500), QUEZON CITY |
Natapos |
100% |
₱9,506,000 |
Quezon City 1st DEO |
| IMPROVEMENT/ CONCRETING of RADO STREET BRGY. FAIRVIEW, QUEZON CITY |
Natapos |
100% |
₱9,506,000 |
Quezon City 1st DEO |
| REHABILITATION of DRAINAGE MALAMBO, QUEZON CITY |
Natapos |
100% |
₱9,505,932 |
Quezon City 1st DEO |
| CONSTRUCTION/ REHABILITATION of MULTI-PURPOSE BUILDING, BARANGAY STO. CRISTO, QUEZON CITY |
Natapos |
100% |
₱9,503,000 |
Quezon City 1st DEO |
| REHABILITATION of ROAD INCLUDING DRAINAGE at BRGY. GREATER LAGRO, QUEZON CITY |
Natapos |
100% |
₱9,495,903 |
Quezon City 1st DEO |
| REHABILITATION of ROAD INCLUDING DRAINAGE at BRGY. GULOD, QUEZON CITY |
Natapos |
100% |
₱9,475,927 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING BRGY. STA. MONICA, QUEZON CITY |
Natapos |
100% |
₱9,410,940 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING (PHASE 2), BARANGAY PASONG PUTIK, QUEZON CITY |
Natapos |
100% |
₱6,929,752 |
Quezon City 1st DEO |
| REHABILITATION of MULTI-PURPOSE BUILDING (COVERED COURT) at ADARNA, BARANGAY COMMONWEALTH, QUEZON CITY |
Natapos |
100% |
₱6,832,715 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING at BRGY. TANDANG SORA, QUEZON CITY |
Isinasagawa |
5% |
₱6,559,898 |
Quezon City 1st DEO |
| CONSTRUCTION / REHABILITATION / IMPROVEMENT of FACILITIES for PERSONS with DISABILITIES (PWD) and ELDERLIES / SENIOR CITIZENS, INCLUDING GENDER RESPONSIVE FACILITIES, QUEZON CITY |
Natapos |
100% |
₱5,775,684 |
Quezon City 2nd DEO |
| CONSTRUCTION of SCHOOL BUILDING, WEST FAIRVIEW HIGH SCHOOL, QUEZON CITY |
Natapos |
100% |
₱4,975,914 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING/ COVERED COURT BARANGAY COMMONWEALTH, QUEZON CITY |
Natapos |
100% |
₱4,949,820 |
Quezon City 1st DEO |
| REHABILITATION / IMPROVEMENT of DRAINAGE SYSTEM, BARANGAY GULOD, QUEZON CITY |
Natapos |
100% |
₱4,949,813 |
Quezon City 1st DEO |
| REHABILITATION of MULTI-PURPOSE BUILDING in BARANGAY NORTH FAIRVIEW, QUEZON CITY |
Natapos |
100% |
₱4,948,816 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BARANGAY BALINGASA, QUEZON CITY |
Isinasagawa |
0% |
₱4,850,867 |
Quezon City 1st DEO |
| REHABILITATION/ IMPROVEMENT/ CONSTRUCTION of MULTI-PURPOSE BUILDING (MORTUARY), BARANGAY SAN JOSE, QUEZON CITY |
Natapos |
100% |
₱4,801,504 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING BRGY. NORTH FAIRVIEW, QUEZON CITY |
Natapos |
100% |
₱4,801,500 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING (B), BRGY. KALIGAYAHAN, QUEZON CITY |
Natapos |
100% |
₱4,801,500 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BARANGAY PASONG PUTIK, QUEZON CITY |
Natapos |
100% |
₱4,801,491 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BRGY. GULOD, QUEZON CITY |
Natapos |
100% |
₱4,801,403 |
Quezon City 1st DEO |
| REHABILITATION of MULTI-PURPOSE BUILDING at BRGY. N.S. AMORANTO, QUEZON CITY |
Natapos |
100% |
₱4,801,374 |
Quezon City 1st DEO |
| CONSTRUCTION/ REHABILITATION of MULTI-PURPOSE BUILDING at JEM 7, BRGY. TALIPAPA, QUEZON CITY |
Natapos |
100% |
₱4,801,315 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING BRGY. SAN AGUSTIN, QUEZON CITY |
Natapos |
100% |
₱4,801,233 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING BRGY. SAN AGUSTINE, QUEZON CITY |
Natapos |
100% |
₱4,801,204 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BARANGAY STA. MONICA, QUEZON CITY |
Natapos |
100% |
₱4,800,855 |
Quezon City 1st DEO |
| CONSTRUCTION/ REHABILITATION/ IMPROVEMENT of MULTI-PURPOSE BUILDING, BARANGAY BAHAY TORO, QUEZON CITY |
Natapos |
100% |
₱4,800,418 |
Quezon City 1st DEO |
| CONSTRUCTION of ROAD MACARIA STREET, BRGY. TALIPAPA (000.0000 to 000.1750) QUEZON CITY |
Natapos |
100% |
₱4,777,500 |
Quezon City 1st DEO |
| CONCRETING of ROAD LIANO & AURIQUE STREET BRGY. SANGANDAAN (000.0000 to 000.1750), QUEZON CITY |
Natapos |
100% |
₱4,777,500 |
Quezon City 1st DEO |
| CONSTRUCTION/ REHABILITATION of MULTI-PURPOSE BUILDING at BARANGAY HOLY SPIRIT, QUEZON CITY |
Natapos |
100% |
₱3,801,600 |
Quezon City 1st DEO |
| CONSTRUCTION of PAYATAS MULTI-PURPOSE BUILDING 6, BRGY. PAYATAS, QUEZON CITY |
Natapos |
100% |
₱3,801,600 |
Quezon City 1st DEO |
| CONSTRUCTION of COMMONWEALTH MULTI-PURPOSE BUILDING, BRGY. COMMONWEALTH, QUEZON CITY |
Natapos |
100% |
₱3,801,600 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING 1, BRGY. FAIRVIEW, QUEZON CITY |
Natapos |
100% |
₱2,400,739 |
Quezon City 1st DEO |
| CONSTRUCTION of MULTI-PURPOSE BUILDING, BRGY. FAIRVIEW, QUEZON CITY |
Natapos |
100% |
₱2,400,677 |
Quezon City 1st DEO |
| REPAIR/ REHABILITATION of VARIOUS MULTI-PURPOSE BUILDING, QUEZON CITY |
Natapos |
100% |
₱1,924,300 |
Quezon City 2nd DEO |
| CONSTRUCTION of PAYATAS MULTI-PURPOSE BUILDING 2, BRGY. PAYATAS, QUEZON CITY |
Natapos |
100% |
₱1,920,800 |
Quezon City 1st DEO |
| INSTALLATION/APPLICATION of ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) along QUIRINO HI-WAY - K0012 + 151 - K0013 + 180, QUEZON CITY |
Natapos |
100% |
₱989,935 |
Quezon City 1st DEO |