E.R. RODRIGUEZ CONSTRUCTION
- Projects
- 4 4 completed, 0 ongoing, 0 upcoming
- Total budget
- ₱170,451,000
- Citizen rating
- Not yet rated
- Finished on time
- 4 of 4 (100%) Only projects with both a target and an actual completion date can be counted.
- Public reports
- 0
How to read these numbers
- Where the data comes from
- Projects, budgets and dates come from the public records of the Department of Public Works and Highways (DPWH), as published. They may be incomplete or out of date.
- What a rating means
- A rating is the opinion of the residents who left it. It is not an audit.
- What a report means
- A report is a problem a resident filed and confirmed by email. It is not a finding that the contractor is at fault. “Looked at” means LGU staff have acknowledged or acted on it.
If something here is wrong, tell us through the contact form.
Reply as this contractorDraft for review: this explanation has not yet been checked by an expert.
Projects
| Project | Status | Progress | Budget | Agency |
|---|---|---|---|---|
| Improvement/desilting of Mangahan Floodway from K0007+600 to K0007+900 Taytay Rizal | Completed | 100% | ₱46,235,000 | Rizal 1st District Engineering Office |
| Flood Conrol Projects based on Master Plan for Metro Manila and Surrounding Areas - Improvement of Cainta River DREDGING/DESILTING | Completed | 100% | ₱45,043,000 | Rizal 1st District Engineering Office |
| Improvement/Construction of Gravity Wall with Gabions as Foundation @ Intermittent Section along Cainta River Sta. 0+450 to Sta. 1+578 Cainta Rizal | Completed | 100% | ₱40,384,000 | Rizal 1st District Engineering Office |
| Improvement/Construction of Gravity Wall (with Gabions as Foundation) at Intermittent Section along Cainta River from Sta. 1+578 to Sta 4+878 and Sta | Completed | 100% | ₱38,789,000 | Rizal 1st District Engineering Office |