DAHL CONSTRUCTION
- Projects
- 7
7 completed, 0 ongoing, 0 upcoming
- Total budget
- ₱140,828,000
- Citizen rating
-
Not yet rated
- Finished on time
-
7 of 7 (100%)
Only projects with both a target and an actual completion date can be counted.
- Public reports
- 0
How to read these numbers
- Where the data comes from
- Projects, budgets and dates come from the public records of the Department of Public Works and Highways (DPWH), as published. They may be incomplete or out of date.
- What a rating means
- A rating is the opinion of the residents who left it. It is not an audit.
- What a report means
- A report is a problem a resident filed and confirmed by email. It is not a finding that the contractor is at fault. “Looked at” means LGU staff have acknowledged or acted on it.
Draft for review: this explanation has not yet been checked by an expert.
Projects
| Project |
Status |
Progress |
Budget |
Agency |
| Improvement/Construction of Gravity Wall with Gabions as Foundation at Intermittent Section and Desiltation Works along Cainta River from Sta 0+000-St CONSTRUCTION |
Completed |
100% |
₱34,071,000 |
Rizal 1st District Engineering Office |
| Construction of Slope Protection along Excavation Dike (Lake Side) West of Mangahan Floodway Sta. 10+056 to Sta. 10+856 Taytay Rizal (Volume=7 220 |
Completed |
100% |
₱26,413,000 |
Rizal 1st District Engineering Office |
| Improvement/Construction of Gravity Wall (with Gabions as Foundation) at Intermittent Section along Munting Dilao River from Sta. 0+000 to Sta. 5+560 |
Completed |
100% |
₱26,242,000 |
Rizal 1st District Engineering Office |
| Clearing of Hyacinths and Dredging of the lower Marikina River besides EFCOS Master Plan Control Station to Mouth of Rosario Weir |
Completed |
100% |
₱14,502,000 |
Metro Manila 1st District Engineering Office |
| Improvement/construction of gravity wall (with gabions as foundation) at Intermittent Section along Taytay River from Sta. 0+978 to Sta. 2+000 Taytay |
Completed |
100% |
₱14,245,000 |
Rizal 1st District Engineering Office |
| Improvement/construction of gravity wall (with gabions as foundation) at Intermittent Section along Cainta River from Sta. 6+000 to Sta. 6+780 |
Completed |
100% |
₱14,244,000 |
Rizal 1st District Engineering Office |
| Restoration of Damaged Slope Protection along Marikina River (Mouth of Rosario Weir) Pasig City (L-45 lm.) |
Completed |
100% |
₱11,111,000 |
Metro Manila 1st District Engineering Office |